The Vendor is required to provide a comprehensive technology infrastructure upgrade across six campus buildings.
- Includes upgrading structured cabling, modernizing the existing camera system, implementing a new access control system, and installing a public address (PA) system to enhance communication and security across the campus.
- Services include:
• As part of the structured cabling upgrade, all existing Category 5 cabling will be removed and replaced with Category 6A cabling to support current and future high-speed network demands.
• This includes terminating and labelling all cable drops in accordance with industry standards, as well as testing and certifying each connection.
• A critical component of this upgrade is the cleanup and reorganization of networking closets in each of the six buildings.
• This will involve the removal of outdated equipment and cabling, the installation of modern patch panels and cable management systems, and proper documentation for ongoing maintenance.
• The camera system upgrade will replace the current analog surveillance infrastructure with a state-of-the-art IP-based solution.
• New IP cameras will be installed to provide full coverage of building entrances, hallways, parking lots, exterior perimeters, and other key areas.
• These cameras will be integrated into a centralized video management system, allowing for improved monitoring, recording, and retrieval of footage.
• The system will be configured and tested thoroughly, with appropriate training provided to campus security staff.
• To further enhance campus security, a modern access control system will be installed.
• This system will include electronic access points on all exterior doors across the six buildings, as well as internal office spaces within the office and department.
• The access control solution will consist of badge readers, control panels, and electronic locking mechanisms integrated with the existing or new security infrastructure.
• Staff will receive training on credential management and system use.
• Additionally, a new public address (PA) system will be installed to provide effective communication throughout the campus.
• The PA system will include speakers and amplifiers installed indoors—covering classrooms, hallways, and common areas— and outdoors in the courtyard and parking areas.
• This system will feature centralized control with zoning capabilities for targeted or building-wide announcements.
• System testing and training will be conducted to ensure proper use by designated personnel.
- Budget: 1,302,325
- Mandatory Conference/Site Visit Date: August 21, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.