The vendor required to provide long term master planning services for project work plan and schedule to include:
- Project initiation, background research, and feasibility analysis
• Prepare a detailed opportunity and constraints analysis of the site area utilizing historical research, site surveys and reviewing background materials.
• Identify parameters of the maximum site capacity conforming to local coastal program (LCP) and research other pertinent development codes.
• Identify amendments, if necessary, to LCP.
• Evaluate compatibility with planned architectural style of dana point harbor commercial core redevelopment effort to develop a contextual reference.
• Provide analysis of existing infrastructure to establish feasibility of increasing site capacity including an assessment of the condition and structural viability of the existing perimeter quay wall.
• Provide recommendations for long term site infrastructure repairs with an initial cost estimate including water, sewer, potential quay wall reinforcement.
- Public outreach and engagement
• Develop and implement a public outreach and engagement plan, including:
o Presentation to dana point harbor oversight advisory committee
o Three (3) community meetings and workshops
o One design charrette with local agencies and user groups
o Online survey and digital engagement platform
o Two (2) roundtable discussions with existing user groups
• Facilitate engagement sessions, synthesize feedback, and facilitate integration of findings into concept development.
- Conceptual design development
• Develop project visioning: draft initial visioning statement and guiding principles to be vetted during public outreach process.
• Develop four (4) conceptual design options that reflect different programming scenarios and site integration approaches as follows:
o Complete replacement conforming to LCP
o Complete replacement non-conforming to LCP
o Major renovation conforming to LCP
o Major renovation non-conforming to LCP
• Identify the degree to which the following design considerations can be provided in each of the four approaches:
o Optimization of the world-class location within dana point harbor
o Optimization of the entire campus including traffic ingress and egress, parking, public amenities, enhanced green spaces, and baby beach
o Public access and act compliance
o Public leasable spaces including offices and special event venues, as well as outdoor areas that maximize views of the harbor and ocean
o Integration and analysis of sailing program and educational needs
o Amenity spaces
o Inclusion of educational and interpretive elements
o Sustainability and green building features.
o Integration with surrounding land uses and site context including proposed design components of the dana point harbor revitalization
• Prepare a schematic package for each of the four approaches including preliminary floor plans, site layouts, square footage of spaces, renderings and diagrams as needed to illustrate concepts.
• Develop 3d renderings that bring each concept to life, illustrating how the area could be transformed and providing a clear, realistic representation of the site’s potential appearance and functionality.
• Provide a rough cost estimate, path of approval, and estimated timeline to completion is to be included for each concept.
• Provide comparison of revenue generation potential for each concept including identification of leasable areas, current market rate amounts based on existing local spaces, and potential annual offset of operational expenses.
- Final visioning plan and presentation
• Prepare visioning plan highlighting existing site concepts, summarizing outreach process, and initial concepts.
• Provide analysis of findings including summary of user needs.
• Provide recommendation of preferred alternative and rationale for this decision.
• Provide recommendations for next steps.
- Project management
• Provide day-to-day contact and attend bi-weekly project meeting.
• Provide meeting notes within one week summarizing discussion items and identifying action items resulting from meeting.
• Provide hourly rates for attendance at additional public outreach workshops and planning meetings.
- Contract Period/Term: 1 year
- Optional Job Walk (Non-Mandatory) Date: December 1, 2025
- Questions/Inquires Deadline: December 4, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.