The vendor is required to provide sound production services as needed basis.
1. Sunday, October 19, 2025
gospel concert (national touring performers)
a. Audio
• Audio coverage for 3,000+ people and 270-degree coverage pattern inclusive of front and side fills
• 4 half ton motors 1 for each hang
• Subs should be arranged in a sub-array format
• (2) 48 channel digital audio consoles
• 10 floor wedges, l & r monitor
• 8 IEM systems
• Drum mic kit package
• 8 wireless handhelds
• 4 boom choir mics
• 10 di boxes
b. Lighting:
• (2) 30+ ft. span of truss
• (2) follow spots with operators
• (20) moving head fixtures 12 beams and 8 washes
• (20) led par cans (can be substituted with moving head washes)
• (4) atomic 3k strobe light
• (6) 775w source 4/lekos fixtures
• (4) 2k conventional wash fixtures
• Grandma2 lighting console
• (4) water-based hazers
c. Video:
• (2) 16x10 fast folds or flow from truss extension
• (2) 12k lumens projectors
• 32 fast fold or flow from truss extension with 16k lumens projector
• Led wall 16 x 10
• HD cameras one w/ a long throw lens with operators
• HD production switcher
• Presentation computer with operator
• SDI connection for jumbo Tron
d. Broadcast:
• Record and save recorded master file for playback and media archive.
• University will provide a drive for storage.
e. Backline:
• Full drum kit, keyboard, base amps, complete mic-Ing and rigging
• Additional items as specified per national touring artist rider to be provided
• ADDITIONAL notes: 50x30ft black drapes as backdrop
2. Monday, October 20, 2025
Coronation and reception
a. Audio:
• Audio coverage for 900+ people w/ 270-degree coverage pattern inclusive of front and side fills
• 4 floor wedges
2. Lighting:
• (University has light board etc. ion xe20)
• (2) follow spots with operators
• (8) led par cans (moving head washes can be used)
• (2) water-based hazers
3. Video:
• (2) HD roaming cameras one w/ a long throw lens with operators
• HD production switcher
• Presentation computer with operator and ability to record
4. Broadcast:
• Record and save recorded master file for playback and media archive.
• University will provide a drive for storage.
3. Tuesday, October 21, 2025
ultimate fashion show and ball
a. Audio:
• Audio coverage for 900+ people w/ 270-degree coverage pattern inclusive of front and side fills
• 4 floor wedges, l & r monitor
b. Lighting:
• (University has light board etc. ion xe20)
• (2) 30+ ft. span of truss
• (2) follow spots with operators
• (20) moving head fixtures 12 beams and 8 washes
• (20) led par cans (moving head washes can be used)
• (4) atomic 3k strobe light
• (6) 775w source 4/LEKOS fixtures
• (4) 2k conventional wash fixtures
• Grandma2 lighting console
• (2) water-based hazers
c. Video:
• (2) HD roaming cameras one w/ a long throw lens with operators
• HD production switcher
• Presentation computer with operator and ability to record
4. Thursday, October 23, 2025
Comedy show, hip-hop and R&B concert (national touring performers)
a. Power:
• 100ft of electrical feeder w/ camlocks and bare cable for tie in to 100amp 3 phase disconnect (can remain throughout the entire week)
b. audio:
• Audio coverage for 3,000+ people w/ 270-degree coverage pattern inclusive of front and side fills
• 4 half ton motors 1 for each hang
• Subs should be arranged in a sub-array format
• (2) 48 channel digital audio consoles
• 10 floor wedges, l & r monitor
• 8 wireless handhelds
• 4 di boxes- 2 separate DJ connections
c. Lighting:
• (2) 30 ft. span of truss
• (2) follow spots with operators
• (20) moving head fixtures 12 beams and 8 washes
• (20) led par cans (can be substituted with moving head washes)
• (4) atomic 3k strobe light
• (6) 775w source 4/LEKOS fixtures
• (4) 2k conventional wash fixtures
• Grandma2 lighting console
• (2) water-based hazers
d. Video:
• (2) 16x10 fast folds or flow from truss extension
• (2) 12k lumens projectors
• 32 fast fold or flow from truss extension with 16k lumens projector
• Led wall 16 x 10
• HD cameras one w/ a long throw lens with operators
• HD production switcher
• Presentation computer with operator
• SDI connection for jumbotron
5. Friday, October 24, 2025
Founder’s Day
a. Power:
• 100ft of electrical feeder w/ camlocks and bare cable for tie in to 100amp 3 phase disconnect (can remain throughout the entire week)
b. Audio:
• Audio coverage for 3,000+ people w/ 270-degree coverage pattern inclusive of front and side fills
• 4 half ton motors 1 for each hang
• 4 floor wedges, l & r monitor 16
• 8 wireless handhelds
• 4 boom choir mics
• 6 di boxes
• Aux line for music playback
• Drum mic package
c. Lighting:
• (2) 30ft span of truss
• 8 washes
• (20) led par cans
• (6) 775w source 4/LEKOS fixtures
• (4) 2k conventional wash fixtures
• grandma2 lighting console
d. Broadcast:
• Live stream the event to university platforms but not limit to Facebook live, YouTube, oracle tv.
• Streaming quality (4k HD or higher and clean audio).
• Save the recorded master file for playback and media archive.
• University will provide a drive for storage.
• Record and save recorded master file for playback and media archive.
• University will provide a drive for storage.
e. Video:
• (2) 16x10 fast folds or flow from truss extension
• (2) 12k lumens projectors
o 32 fast fold or flow from truss extension with 16k lumens projector
o led wall 16 x 10
o HD cameras one w/ a long throw lens with operators
• HD production switcher
• Presentation computer with operator
• SDI connection for jumbo Tron
f. Backline:
• Patch in a keyboard and organ player
g. Additional notes:
• 50x30ft black drapes as backdrop
• Choir will perform and there will be a guest speaker
• Production company will provide 40wx32dx4h stage
• (5) microphones for the choir
• (2) microphones for the stage - one at the main podium and one on the table for the ceremony
• (1) microphone on the floor for the induction
• The university provides (university begins setup at 5:00 am)
o Backdrop (32x16) that will be on set as the backdrop of the stage.
o The backdrop is set by using a pipe and drape stand kit.
o The university facilities department will build and strike the backdrop setup
o Risers for the choir
o Chairs and podium on main stage.
- Contract Period/Term: 1 year
- Questions/Inquires Deadline: August 13, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.