The vendor required to provide planning and scheduling services of improving the effectiveness and efficiency of existing transit service and expanding services to meet current and future community needs.
- Service planning
• Support the development of the 5-year service plan.
• Plan fixed-route network adjustments to accommodate bus rapid transit (BRT) implementation.
• Develop a regional express plan, including assessment of need and potential demand for express services.
• Conduct analysis of existing conditions and opportunities for current and potential service areas, including demographics, geospatial analysis, ridership trends, transportation system performance, land use patterns, and development proposals.
• Assess multi-modal access and transit-oriented development potential.
• provide planning and best practices research for on-demand, micro transit and other flexible service models and innovative first-mile last mile strategies.
• Fare and service changes and integrate equity considerations into all service planning projects and proposals
- Rider engagement and public outreach
• Conduct a system-wide origin-destination survey
• Design and deploy on-board surveys for individual planning analyses
• Create graphics, maps, and materials to communicate existing and proposed services using industry best practices.
• Support public outreach initiatives for proposed and upcoming service changes, including public meetings, focus groups, and surveys.
• Develop innovative outreach and in reach programs to increase engagement with service planning concepts both with the public and authority staff and operators.
- Scheduling
• Perform scheduling tasks using trapeze FX and blockbuster, including scheduling, blocking, run-cutting, and rostering.
• Provide technical training for new and existing staff on scheduling concepts, theories, and software tools.
• Assist scheduling team with data integrity checks and general maintenance of schedule and stops data.
- Data analysis and reporting
• Perform technical analysis of transit service, assessing performance, service areas, speed, reliability, and other critical factors.
• Troubleshoot existing and future data sources, ensuring data integrity and reconciliation between disparate systems, especially for ridership, schedule reliability and service delivery data.
• Develop performance metrics for service monitoring and assist with the application of authority fixed-route service standards. recommend policy updates based on local conditions and industry best practices.
• Support certification of automatic passenger counters (APCS) on streetcars for national transit database (NTD) reporting.
• Assist in process improvement for NTD reporting methods
• Develop and troubleshoot new ways to report data using authority current available tools like excel and power-bi, both internally and externally.
• Assist in producing reports to audiences such as elected officials, appointed board members, and the general public.
• Assist with the NTD annual and triennial audits
- Cost and ridership modeling
• Perform economic and financial analysis for proposed service and fare changes.
• Develop cost model for service delivery
- Capital projects and strategic planning support
• Assist with annual updates to authority strategic mobility plan.
• Provide technical support for the development of capital grant applications.
• Perform corridor-specific run-time and ridership analyses to support corridor and transit priority planning
• Conduct preliminary investigations, feasibility studies, conceptual design work, and benefit-cost analyses.
• Support stops rebalancing initiative to reduce redundancy and improve efficiency and speed of service while considering customer convenience and the built environment
- Technology and innovation
• Provide research and best practices for implementing new software and technology to enhance scheduling, planning, data analysis, and efficient service delivery.
• Support the planning and implementation of new transit modes and services.
• Assist with fare technology modernization strategy and implementation.
• Support planning and scheduling for deployment of zero-emission vehicles.
- Questions/Inquires Deadline: November 20, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.