The vendor is required to provide outdoor wireless network management monitoring and inspection of the physical towers and radio equipment at each location.
- The wireless network requires ongoing maintenance, with the height and location of hardware requiring specialized services needed to complete the work.
- This may include:
• Performing annual site inspections for all towers, antenna, cabling, and antenna mounting systems,
• Documenting the results of annual inspections including recommendations for proactive maintenance,
• Providing scheduled and unscheduled antenna, mount, and wireless radio system repairs.
• Providing scheduled and unscheduled troubleshooting and remediation of coverage and performance issues,
• Installing surveillance and streaming video cameras
• Conducting new antenna system installations, and
• Performing grounding installation and maintenance.
- Network is used throughout the organization for various services which include, but are not limited to:
• Emergency services utilize the 4.9 GHZ wireless radio equipment on the traffic lights for preemptive response timing,
• The transportation department utilizes the 4.9 GHZ wireless access points for management of the intelligent traffic system.
- Monitoring and maintenance
1. Physical proactive maintenance, replacements, and installations which will include:
• Tower inspections
• Equipment inspections
• Weatherproofing
• Antenna maintenance
• Cabling
2. Logical maintenance and daily monitoring (24x7x365) for the outdoor wireless network is also required for:
• Firmware and patching updates
• Bandwidth changes
• Power levelling
• Topology changes
• Switch configuration and performance monitoring.
- Wireless base stations inspection and maintenance
• Tower base – anchor and anchor rods
• Tower structure and all structural fasteners
• Ladder and anti-fall system
• Antennas, mounts and cable
• Obstruction lighting system
• Paint and obstruction marking
• Site and building
• Verify antenna and transmission line profiles
• Verify tower alignment using a transit
• Verify grounding strategy.
- Contract Period/Term: 3 years
- Questions/Inquires Deadline: October 8, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.