The vendor is required to provide network data drop installation services for the installation of data drops on an as needed basis per.
- Requirement
• Take precautions to protect university personnel and students in the area.
o Cordon off work areas.
o Keep trip hazards (materials, cords, tools, etc.) out of walk paths.
o Promptly clean up slip hazards (spills).
• Take precautions to protect university property.
o Protect wall, floors, doors, etc. as necessary to prevent damage from contractor activities.
o Contain dust to work area and protect walls, ceilings, furniture, drapery, window blinds, equipment, elevated horizontal surfaces, and any other items that cannot be easily and effectively cleaned.
o Any damage by contractor shall be corrected by the contractor at the contractor’s expense.
• Responsible for the removal of all construction related debris.
• Provide an accurate schedule with work dates for each room.
• University will remove and replace furniture per this schedule, if necessary.
• Products are to be installed per the manufacturer’s specifications.
• Thoroughly clean and straighten the area upon the completion of the project.
• Provide standard product warranty and a one-year guarantee on his workmanship.
• Demonstrate they are Siemon cat6 certified for data drops and corning Fibre optic certification for Fibre installs.
- Contract Period/Term: 1 year
- Questions/Inquires Deadline: November 4, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.