The vendor is required to provide material recovery facility (MRF) single-stream collection and processing system for a supplier to enter into a contract for design and build of a MRF for safe, effective, and sustainable processing and marketing of recovered recyclables from a single-stream collection stream.
• Detailed technical specifications of proposed equipment suitable for mid-sized municipal recycling operations.
• Description of performance capabilities (e.g., throughput, contamination rates, automation levels).
• MRF equipment design, manufacture, transportation, installation and startup services.
• Acceptance procedure to be used for testing and validation of the MRF equipment solicited prior to its final acceptance.
• Warranty details and service and maintenance plans.
- MRF Site and Building Pre-Bid Visit Period Date: August 11, 2025
- Questions/Inquires Deadline: September 5, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.