The Vendor is required to provide gate management system (GMS) and flight information display system (FIDS) to analyze and compare proposals from vendors to provide a comprehensive, scalable, and cloud-native GMS and FIDS.
- Gate management system (GMS) requirements
1. Automated gate and stand assignments:
• Allocate gate dynamically based on flight schedules, aircraft type, and operational needs
• Provide real-time updates using data from swim, ads-b, and other sources.
• Enable manual overrides for exceptional cases or emergencies.
2. Scenario analysis and forward planning:
• Offer tools for simulating different operational scenarios (e.g., peak traffic periods, weather descriptions)
• Support forward planning for up to 90 days to optimize resource allocation.
3. Integration with airport operations database (AODB):
• Service as a centralized platform for real-time operational data.
• Enable seamless data sharing with other systems, such as FIDS, baggage handling, and security
4. Analytics and reporting:
• Generate detailed analytics on gate utilization, delays, and passenger flow.
• Provide customizable reports to support data-driven decision-making.
- Flight information display system (FIDS) requirements
1. Real-time flight data display:
• Show accurate, up-to-the-minute information on departures, arrivals, gate assignments, and baggage claim statuses.
• Incorporate automated updates via integration with the airport’s GMS and AODB.
2. Multilingual and accessible content:
• Display information in multiple languages to accommodate diverse passenger demographics.
• Include accessibility features, such as high-contrast modes and screen readers, to comply with ADA guidelines.
3. Dynamic content management:
• Support advertisements, emergency notifications, and customizable layouts.
• Offer tools for airport staff to update content remotely in real time.
4. Mobile-friendly features:
• Provide an iOS and android-compatible FIDS app for passengers
• include web widgets for integration into the airport’s website
- Installations of systems:
• Install GMS software on cloud infrastructure with minimal local server dependency.
• Deploy pi devices and configure associated screens for the FIDS.
- Risk management:
• Development and implement a risk management plan to address potential deployment challenges, including system downtime and data migration.
- Contract Period/Term: 4 years
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.