The vendor is required to provide wayfinding signage master plan that includes destination identification and directional signage for vehicles, bicycles, and pedestrians that directs visitors and residents to key destinations.
- The wayfinding signage master plan describe the standard of required function, dimension, appearance, performance, and quality to be met by the fabricator
- The installer is responsible for removing the existing sign at the sign location including below grade footings and foundations completely, filling with compacted soil, and repairing landscaping.
- All post-mounted signs located in hardscape locations must include breakaway supports.
- Base bid sign numbers and locations included are as follows:
• G-3, vehicular trailblazer, 5”
• G-3a, vehicular guide, 4”
• G-3a, vehicular guide, 4”
• K-2, trailhead kiosk
• K-2, trailhead kiosk
• P-1, parking id, large
• G-3a, vehicular guide, 4”
• G-3a, vehicular guide, 4”
• G-4, utility guide, 4”
• G-4, utility guide, 4”
• G-4, utility guide, 4”
• P-1, parking id, large
• P-1, parking id, large
• P-3, parking guide
• P-3, parking guide
• P-3, parking guide
- Alternate no. 1 – Lyons’s ridge
• Subdivision identification – Lyons’s ridge, fabrication of subdivision identification sign, removal of existing subdivision sign, and installation of new subdivision identification sign.
- Alternate no. 2 – Brigadoon
• Subdivision identification – Brigadoon, fabrication of subdivision identification sign, removal of existing subdivision sign, and installation of new subdivision identification sign.
- Questions/Inquires Deadline: July 21, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.