The vendor required to provide fabrication and installation of wayfinding signage services for include:
1. Pre-construction
• Verify sign locations (in field)
• Survey
• Subsurface utility coordination
• Develop production drawings
• Submittal of all production materials for henry county approval
2. Permitting and reviews
• Department approval of stamped production drawings
• Department permit of signage locations
3. Sign fabrication
4. Construction and installation
• Demolition and disposal of existing signage
• Use of durable, breakaway, weather-resistant materials
• Installation of new footings and signage
• Compliance with ADA standards and MUTCD guidelines where applicable
• As-builts
5. Attendance in, and meeting minutes of, monthly meetings to discuss progress and issues (additional meetings may be required to resolve major project issues).
- Questions/Inquires Deadline: December 4, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.