The Vendor is required to provide for power management and power quality improvement resulting in decrease in total electrical energy consumption and increase in electrical system efficiency without replacing inefficient electrical and mechanical equipment.
- Power management and power quality improvement resulting in decrease in total electrical energy consumption and increase in electrical system efficiency without replacing inefficient electrical and mechanical equipment.
- Solutions proposed should increase the efficiency of electrical and mechanical equipment in the building to increase the overall energy efficiency of the building.
- The steps taken to improve the efficiency of the electrical system should contribute to decreasing the carbon footprint.
- The products and solutions proposed should not interrupt the power supply to the connected equipment when the proposed system fails.
- All solutions proposed should decrease down time during service repair and maintenance.
- Performance efficiency should be consistent even in varying load conditions.
- Contract Period/Term: 1 year
- Questions/Inquires Deadline: December 11, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.