The Vendor is required to provide the public address system at the airport.
- Installation of The Public Address System with a four (4) zone Processor and Amplifier.
• Initial installation will be with three (3) paging zones
o Two (2) interior zones with
• Ten (10) speakers in the Main Terminal, including café lounge area (Light Blue, Dark
• Purple and Dark Red on Diagram)
• Ten (10) speakers in the Secure Hold area (Tan on Diagram)
o One (1) exterior zone with
• Four (4) new outdoor speakers (Yellow on Diagram)
• Additional one (1) zone ports for future expansion
o One Volume Control knobs for each Zone (Red on Diagram)
- Web Based Interface for Programming
- Recorded Message Playing Option
- Music Input Option
- Amplifier, Processor, and all associated head equipment must be installed in an enclosed lockable wall mount rack cabinet (Blue Square on Diagram)
- Consideration and the safety of our Passenger must be maintained at all times.
- Job site sanitation must be adhered to and maintained throughout the job
- Scaffolding, lifts, and ladders must be provided by the contractor and secured at the end of each working day.
- Contract Period/Term: 1 year
- Pre-Bid Meeting (Non-Mandatory) Date: December 16, 2025
- Questions/Inquires Deadline: December 23, 2025