A government agency in Texas issued “Testing Adjusting and Balancing Services” (RFQ). Solicitation ACCT-0475 closed on September 23, 2025. Eligibility: Only for USA Organization.
The vendor is required to provide the testing, adjusting, and balancing (TAB) provide a comprehensive and systematic approach to ensure that all mechanical, electrical, and plumbing (MEP) systems.
a. Pre-construction auditing and planning:
• Review and analyze contract documents, project specifications, and design intent to identify potential system performance risks before installation.
• Assess equipment selections, system capacities, and design assumptions to verify compatibility with operational goals.
• Provide design and submittal reviews, offering expert recommendations on performance enhancements and constructability.
b. Construction phase testing and reporting:
• Coordinate with the commissioning authority (CXA) to ensure commissioning requirements are met.
• Conduct periodic audits of installed systems, verifying compliance with approved submittals and manufacturer recommendations.
• Monitor equipment startup procedures, ensuring proper calibration and sequencing for optimal performance.
• Track and document deficiencies, collaborating with contractors to resolve issues efficiently.
• Provide detailed interim reports summarizing progress, deficiencies, and corrective actions taken.
c. Final testing, balancing, and system optimization:
• Perform rigorous air and hydronic balancing in compliance with standards.
• Utilize precision instruments to conduct flow, pressure, temperature, and operational performance testing.
• Adjust system components to achieve design airflow, water flow rates, temperature control, and equipment performance parameters.
• Verify that all specified testing, cleaning, adjusting, and commissioning requirements have been completed.
• Ensure ventilation and indoor air quality standards are met department of licensing and regulation (TDLR) requirements.
d. Post-completion verification and documentation:
• Provide a comprehensive TAB final report, including all measurement data, adjustments made, and system performance benchmarks.
• TAB reports shall include detailed measurements of system performance, including airflow accuracy within ±5% of design specifications and hydronic flow accuracy within ±3%.
• Reports will be submitted biweekly during construction and a final report within 10 days of substantial completion.
• Any variances exceeding these thresholds will require corrective actions documented with a resolution timeline.
• Review and validate O&M manuals and as-built documentation to confirm alignment with final system settings.
• Conduct operator training sessions to ensure facility personnel fully understand system operation, controls, and maintenance requirements.
• TAB firm shall conduct a minimum of three (3) structured training sessions for facility operators, covering system operation, troubleshooting, and long-term maintenance strategies.
• Training materials and video documentation will be provided.
• The TAB firm will offer post-handover support for 90 days, including remote consultations and one on-site follow-up session.
• Implement a TAB issues log, tracking all discrepancies, non-conformance items, and resolutions to ensure accountability and transparency.
- Contract Period/Term: 3 years
- Mandatory Pre-Submittal Conference Date: September 09, 2025 and September 10, 2025
- Questions/Inquires Deadline: September 16, 2025
Ask any question about the RFP and its amendments. Instantly surface schedules, deliverables, compliance items, evaluation criteria, and budget details with 100% source-backed answers.
Quick answers about deadlines, eligibility and submission for this solicitation.
No. This opportunity (ACCT-0475) closed on September 23, 2025. See similar open RFPs below.
A government agency in Texas. The buyer's contact and submission details are in the solicitation documents.
Only for USA Organization.
Contract term: 3 years.
Yes: Mandatory on September 9, 2025.
Questions and inquiries must be submitted by September 16, 2025.
Yes. After purchase, with a subscription or during a free trial, the RFPPlanet AI Assistant answers questions sourced from this RFP’s documents, such as requirements, evaluation criteria and key dates.
Set up free email alerts and get notified when new government and private-sector bids and tenders match your industry and location. Choose daily or weekly delivery.