The vendor is required to provide on performing sewer cleaning and cctv inspections in all six (6) districts in the city.
- Hours of work
• The contractor shall be permitted to work on-site from 7:00 am to 5:30 pm, Monday through Friday.
• The contractor may be permitted to work during extended hours outside of this time, but only upon receipt of the department express written authorization.
- Sewer cleaning services shall generally consist of the following:
• Thoroughly clean main lines using high-pressure water jetting, high-flow vacuuming, power rodding, or mechanical cutting (“chain flailing” or similar) to remove all material (“spoils”) including sludge, dirt, rocks, grease, organics, roots, debris, and other solid or semisolid material.
• This is discussed further in the sewer line cleaning guide.
• Install a temporary catchment apparatus at the nearest available downstream system access point (e.g., manhole) to trap all spoils cleared and flushed from the sewer.
• Provide neat and orderly removal of spoils from the system, and provide legal disposal of spoils.
• Remove the temporary catchment apparatus from the system following removal of spoils.
• Provide the city with reports of the cleaning activity as specified in the sewer line cleaning guide.
- Cctv inspection
• Prepare system appurtenance for inspection, including cleaning the appurtenance as necessary.
• Inspect system appurtenance using cctv equipment designed for use within a sanitary sewerage collection system, and record inspection.
• Provide department with a digital copy of the inspection video and a report of inspection results.
- Contract Period/Term: 1 year
- Questions/Inquires Deadline: July 17, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.