The vendor required to provide access control system for include:
• Clear description of work required
• All programming and commissioning shall be done while on site.
• All exposed wire shall be housed in finger tracking or conduit as applicable to the environment.
• Configure and test the equipment using win-Pak and pro-watch software in conjunction with cos-cs.
• All cables and access equipment in the electrical room shall be labelled as applicable.
- Contract Period/Term: 3 years