Contractor shall provide all labor, material, and equipment necessary to clean, disassemble/reassemble, and inspect all lifting machinery for the Barkley Lock Emergency Lift Gate, including but not limited to the limit switch assemblies, motors, enclosed gears, open gears, gear mounting assemblies, drums, sheaves, wire rope, brakes, shaft bearings, couplings, and control equipment. Provide the initial inspection reports with pictures of the equipment that show any deficiencies found during the inspection. Provide touch-up painting for all exterior surfaces of items in the scope of work after inspection except as otherwise noted. If a contract option is exercised, paint the respective components (except as otherwise noted) after the work in the contract option is completed. After completion, provide as-built reports that show as-built fits, backlashes, contact patterns and end floats. Initial inspection reports and as-built reports shall be required for all open gears, limit switch assemblies, and enclosed gears. Mark-up of the PDF for as-builts are acceptable. No CAD drawings shall be required for the as-builts. Provide new oil, grease, filters, fasteners, keys, and others as needed to get the Emergency Gate (E-Gate) machinery ready for operation.
Details
Posted Date:Thursday, 11 Jun, 2026
Response Deadline:Friday, 10 Jul, 2026
Set-Aside:NA
Contracting Office Address:NASHVILLE, TN
Download Documents
FED-04864
We do not host federal RFP documents on our server. After purchase, you will be redirected to the official SAM.gov website to download documents.
Never Miss a Government RFP Again
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.
We use cookies to improve your experience, remember your preferences, and analyze site traffic. By clicking "Accept", you consent to our use of cookies. Privacy Policy