🔥 Flat 5% OFF Everything - Use Code at Checkout!
Replace Flooring Bldg 102 & Bldg 110
USA
Expired
Description
The scope of work for this requirement involves removing approximately 1,260 square feet of vinyl and carpet flooring, reconditioning approximately 4,825 square feet of existing floors in two separate buildings. The Contractor shall provide all necessary supervision, labor, materials, tools, and equipment necessary to accomplish the work, as identified in the Statement of Work. The magnitude of this requirement is between $25,000 and $100,000. A site visit is tentatively scheduled for Wednesday 27 May at 0800 PDT. The designated rally point will be the west gate parking lot. Parking space is limited, carpooling is strongly advised. Offerors must complete the Defense Biometric Identification System (DBIDS) Prequalification and be listed on the base access form to obtain base access. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided 5 business days before the site visit. Refer to Attachment, Base Access Request for additional instructions. As required by 15 U.S.C. § 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses: (A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204. (B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below: Selected Agency: DEPT OF THE ARMY Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts 30 days or less: 0 31 to 60 days: 1 61 to 90 days: 0 91 to 180 days: 0 181 to 365 days: 1 Greater than 365 days: 1 After completion of contract performance via a contract modification addressing all undefinitized equitable adjustments received during contract performance 2 Update 1: Questions and Answers, Images of Flooring and Drawings are attached.
Details
Posted Date:Thursday, 11 Jun, 2026
Response Deadline:Friday, 12 Jun, 2026
Set-Aside:SBA
Contracting Office Address:FRESNO, CA
Download Documents
We do not host federal RFP documents on our server. After purchase, you will be redirected to the official SAM.gov website to download documents.
Never Miss a Government RFP Again
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.
We use cookies to improve your experience, remember your preferences, and analyze site traffic. By clicking "Accept", you consent to our use of cookies. Privacy Policy