The Contractor shall develop bridging documents, consisting of conceptual design, technical specifications, and performance criteria for the complete repair of seventeen electric elevators (12 passenger and 5 freight as identified in the 2024 Elevator Assessment) replacing all components that are obsolete and/or have reached end-of-life, including MEP systems upgrades, ACM abatement, PCBs removal, structural and architectural alterations to bring the existing machine rooms and hoistways up to code. New elevator controllers shall be integrated with BEP’s existing Supervisory Control and Data Acquisition (SCADA) system. The bridging documents should provide enough detail to allow successful solicitation of a design-build construction contract addressing complete alteration of the elevators. The Contractor shall ensure compliance with all federal, state, and local regulations, minimize disruption to building operations during installation and achieve targeted energy savings and sustainability goals.
Details
Posted Date:Thursday, 11 Jun, 2026
Response Deadline:Tuesday, 21 Jul, 2026
Set-Aside:SBA
Contracting Office Address:WASHINGTON, DC
Download Documents
FED-05298
We do not host federal RFP documents on our server. After purchase, you will be redirected to the official SAM.gov website to download documents.
Never Miss a Government RFP Again
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.
We use cookies to improve your experience, remember your preferences, and analyze site traffic. By clicking "Accept", you consent to our use of cookies. Privacy Policy