A federal contracting office in Lakewood, CO posted “AZ BL COLO 7528(1) Burro Creek Road” (Solicitation) on SAM.gov on October 16, 2026. Responses are due November 17, 2026. NAICS 237310. Set-aside: Small Business Set Aside - Total.
Description
PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-January - 2027 Construction – January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000
Key Dates & Details
Posted Date:Friday, 16 Oct, 2026
Response Deadline:Tuesday, 17 Nov, 2026
Set-Aside:SBA
Contracting Office Address:Lakewood, CO
Download Documents
FED-29672
Federal RFPs are free for registered users. Log in or create a free account to open the official notice on SAM.gov.
Questions about this opportunity
Quick answers about the deadline, notice type and who is buying.
When are responses due?
Responses for FED-29672 are due by November 17, 2026.
What does “Solicitation” mean?
A Solicitation is the formal request for offers. Follow the instructions, evaluation criteria and deadline in the official documents when you prepare your response.
Which office is handling this notice?
The contracting office is in Lakewood, CO.
Is this opportunity set aside for small businesses?
Small Business Set Aside - Total.
What NAICS code applies?
NAICS code 237310.
Where are the official documents?
Federal solicitation documents are published on SAM.gov. RFPPlanet links you to the official notice for free once you log in to your RFPPlanet account.
Set up free email alerts and get notified when new government and private-sector bids and tenders match your industry and location. Choose daily or weekly delivery.
We use cookies to improve your experience, remember your preferences, and analyze site traffic. By clicking "Accept", you consent to our use of cookies. Privacy Policy