Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
USA
Closes in 31 days
A federal contracting office in Batavia, IL posted “Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB” (Solicitation) on SAM.gov on November 2, 2026. Responses are due December 17, 2026. NAICS 236210. Set-aside: No Set aside used.
Description
On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026. On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
Key Dates & Details
Posted Date:Monday, 02 Nov, 2026
Response Deadline:Thursday, 17 Dec, 2026
Set-Aside:NONE
Contracting Office Address:Batavia, IL
Download Documents
FED-30986
Federal RFPs are free for registered users. Log in or create a free account to open the official notice on SAM.gov.
Questions about this opportunity
Quick answers about the deadline, notice type and who is buying.
When are responses due?
Responses for FED-30986 are due by December 17, 2026.
What does “Solicitation” mean?
A Solicitation is the formal request for offers. Follow the instructions, evaluation criteria and deadline in the official documents when you prepare your response.
Which office is handling this notice?
The contracting office is in Batavia, IL.
Is this opportunity set aside for small businesses?
No Set aside used.
What NAICS code applies?
NAICS code 236210.
Where are the official documents?
Federal solicitation documents are published on SAM.gov. RFPPlanet links you to the official notice for free once you log in to your RFPPlanet account.
Set up free email alerts and get notified when new government and private-sector bids and tenders match your industry and location. Choose daily or weekly delivery.
We use cookies to improve your experience, remember your preferences, and analyze site traffic. By clicking "Accept", you consent to our use of cookies. Privacy Policy