The Vendor is required to provide to supply and support digital signage solutions and associated services for the center.
- System description
β’ Supply 1 2.4mm 35β9βx5β2β screen for north atrium entrance
β’ Supply 1 2.4mm 79βx4β8β screen for the 1d banner
β’ Supply 1 2.4mm 33βx4β8β screen for the star buck north banner
β’ Supply 1 2.4mm 24βx4β8β screen for the shoeshine banner
β’ Supply 4 1.9mm 63βx70β screens for the charging stations
β’ Supply 1 2.4mm 20βx20β screen on 3rd floor north atrium
β’ Provide primary and backup processing for all screens.
β’ Provide 20% spares
β’ Configure system networking per IT requirements
β’ Supply 16 (+ spares) 43-55β low profile meeting room screens
o Can be LCD
o Must be low-profile (less than 4β)
β’ Supply 10 exterior 2.4mm 75βx35β double-sided screens for the inner roadway
β’ Supply 7 2.4mm 90βx256β double-sided screens to be mounted into extant steel framing for the concourse flags
β’ Supply 4 2.4mm 48βx156β double-sided screens to be mounted into extant steel framing for the crystal palace flags
β’ Provide primary and backup processing for all screens.
β’ Provide 20% spares
β’ Supply 25 (+ spares) 43-55β low profile meeting room screens
β’ Supply 6 screens for concourse faces
o Size is typically 90βx12β6β
β’ Supply 3 exterior 2.4mm 75βx35β double-sided screens for the inner roadway
β’ Supply 1 2.4mm 33β4βx4β8β screen for NW Starbucks banner
β’ Supply 1 2.4mm 33β4β x4β8β screen for SW Starbucks banner
β’ Supply 1 2.4mm 33β2β x4β8β screen for se Starbucks banner
β’ Supply 1 2.4 mm 24β9β x4β8β screen for 3e banner
β’ Provide primary and backup processing for all screens.
- Programming and controls
β’ Led programming by a certified programmer
β’ Integrate control system specified by AV
- Project management and labor
β’ Dedicated project management
β’ Furnish all equipment per the approved bill of materials
β’ Delivery of materials to site, per schedule
β’ On-site project management support during installation
β’ On-site installation training and support
β’ System testing, commissioning, and owner training
- Scheduling and work conditions
β’ All work performed during normal working hours: 7:00 am β 4:00 pm
β’ Provide delivery timeline for each screen.
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.