The Vendor is required to provide signage fabricator to fabricate and install a new exterior signage program designed by Corbin design.
- The project will include the removal of existing signs as noted in the sign message schedule.
- Pre-fabrication submittals
• Include all pertinent dates and milestones such as submittal delivery dates, required approval dates, fabrication dates and installation dates;
• Include all lead times for materials and third-party supplied items;
• Include dates for when any provided artwork will be required, i.e. Graphics, inserts, maps, directories, murals, etc.
• Allow a minimum of 15 business days for owner representative and designer review with at least one round of revisions;
• Include submittal delivery dates;
• Throughout the duration of the project, the fabricator is required to maintain and update the schedule of work, submitting weekly.
• Detailed engineered shop drawings for each sign type are to be submitted as electronic pdf no larger than 11"x 17" and packaged as single document.
• Final shop drawings are to be stamped by an engineer licensed in the state of the project.
• Elevations and cross sections – front, sides, top and back (if necessary); side sections; internal structure section and details; enlarged details such as of extrusions, push-through letter mounting, mounting plate, etc.; with all final dimensions and call-outs for:
o Components – construction details and information related to individual elements
o Materials – color, type, gauge, and thickness (including substrates and overlays)
o Finishes – color, type of product, manufacturer, and sheen
o Fonts, graphics specifications and message fields
• Exploded view (optional) – isometric view with components, materials, and finishes.
• Cross-section of corners – one illustration for each corner condition.
• Items to be illustrated: seams, joints, layers, internal support and fasteners.
• A graphic layout proofing document of final production for all sign messages to verify line breaks, character and word spacing, and interline spacing.
- After-installation submittals
• Warranty documentation, product cut sheets, maintenance instructions and manuals for all sign components (lighting, paint, etc.), along with amended as-built shop drawings, as-installed sign location plans and approved graphic layout documents shall be supplied by successful bidder to owner upon completion of inspection and punch list items.
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.