The Vendor is required to provide gateway signage services for include:
- Review
• Verifying all site conditions with regards to fabrication and installation before manufacture of signage.
• Any conditions that would impede the proper and timely completion of the work should be presented to the owner’s representative in writing.
• Locations shown on the sign location plans are for general placement.
• The fabricator shall confirm each sign location with the owner’s representative of any discrepancies in the design documents or graphics schedule as well as discrepancies shall be brought to the attention of the owner’s representative prior to production.
• Any conflicting conditions with signage that are not coordinated prior to the manufacturing of work will need to be addressed in the punch list phase and will be the responsibility of the vendor.
- Materials
• All wood, stone, brick or brick veneer components to be sealed to protect against decay, mildew, and discoloration
• All aluminum components and panels to have a minimum wall thickness of .125” or greater
• The interior of all illuminated cabinets is to be painted bright white.
- Installation
• Post and panels in concrete or pavement to be installed via core drill footing and backfill.
• All breakaway details to conform to state dot standard requirements.
• Exterior ADA signs containing braille should be produced using exterior grade photopolymer.
• Pin mounted letters should be set in Hilti epoxy or equivalent to deter theft and vandalism. Exterior pin mounted letters should be set in Hilti epoxy or equivalent and sealed with silicone or equivalent waterproofing sealer.
• Signage design and installation for this project must conform to all federal, state, and city regulations and ordinances.
• It is the responsibility of signage fabricator to submit drawings to the proper agencies for review and approval prior to construction.
• It is also the responsibility of the signage fabricator to obtain the necessary permits and approvals prior to construction.
• Footings to be state stamped engineered footings with backfill as needed.
• It is the responsibility of the signage fabricator to include and perform all priming work as needed for wallcovering and graphics unless specifically stated as an exclusion in the vendor bid.
• Final electrical hook-up to be completed by the vendor
• Include painted aluminum trim cap for all lit channel letters.
- Signage protection
• Fabricator to coordinate protection of sign until punch list is completed by owner.
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.