USA(Massachusetts)
SYS-0391

RFP Description

The vendor is required to provide for installation of owner provided emergency notification system in correctional setting.
- The work consists of the work identified in the contract documents.
- The work comprises the completed construction required by the contract documents and includes all labor, tools, materials, supplies, equipment, permits, approvals, paperwork, calculations, submittals, and certificates necessary to develop, construct and complete the work in accordance with all laws, and all construction and other services required to be supervised, overseen, performed or furnished by contractor or that the contract documents require the contractor to cause to be supervised, overseen, performed or furnished.
- The contractor shall provide and perform for the contract price all of the duties and obligations set forth in the contract documents.  
- Before commencing the work, the contractor shall carefully study the contract documents and carefully compare all specifications, plans, drawings, figures, dimensions, lines, marks, scales, directions of the designer, and any other information provided by the awarding authority and shall at once report to the designer any questions, errors, inconsistencies, or omissions.
- Employ a registered land surveyor to perform any engineering required for establishing grades, lines, levels, dimensions, layouts, and reference points for the trades.
- Maintaining benchmarks and other survey marks and shall replace any benchmarks or survey marks that may have become disturbed or destroyed.
- Verify the materials shown on the drawings before laying out the work and shall be responsible for any error resulting from its failure to exercise this precaution.
- Furnish batter boards and stakes and shall cause to be placed and maintained thereon so as to be easily read, such lines, marks and directions relating to the work as the designer shall from time to time direct.
- The designer shall establish base lines and benchmarks on the drawings for the locations of the work but all other lines and grades shall be determined by the contractor.
- Provide pumping, drainage, and disposal of all water and other flows so that no puddle, nuisance, or damage will be caused by water or flooding.
- Contract Period/Term: 1 year
- Mandatory Pre-Bid Meeting Information Date: March 12, 2025
- Questions/Inquires Deadline: March 18, 2025

Timeline

RFP Posted Date: Monday, 24 Feb, 2025
Proposal Meeting/
Conference Date:
Mandatory
Wednesday, 12 Mar, 2025
Deadline for
Questions/inquiries:
Tuesday, 18 Mar, 2025
Proposal Due Date: Tuesday, 25 Mar, 2025
Authority: Government
Acceptable: Only for USA Organization
Work of Performance: Offsite
Download Documents

Similar RFPs

CANADA(Alberta)