A government agency in California issued “Production Cost Modeling Software” (RFP). Solicitation SYS-1888 closed on August 29, 2025. Eligibility: Only for USA Organization.
The Vendor is required to provide for production cost modeling software (resource planning "RP" software) to support the city renewable goals.
- The Integrated Resource Plan (IRP) is a comprehensive planning process used to determine how to meet department goal in a reliable, cost-effective, and environmentally responsible way.
- The solution must support one or more of the following deployment models.
- Must indicate which models are supported and provide infrastructure requirements for each:
1. On-Premises Deployment
2. Vendor-Hosted Cloud (SaaS)
3. Customer-Hosted Cloud (IaaS/PaaS on Microsoft Azure, AWS, or Google Cloud Platform)
4. Hybrid Deployment (combination of on-premises and cloud components) - On-Premises Server Requirements
1. Operating System Compatibility
• The solution must be compatible with the following Microsoft server operating systems:
• Windows Server 2022 (Standard or Datacenter, 64-bit)
• Windows Server 2019 (Standard or Datacenter, 64-bit)
2. Virtualization Support
• The software must operate reliably in virtual environments such as:
• Nutanix Acropolis Hypervisor (AHV)
- Cloud Hosting Requirements
1. Vendor-Hosted Cloud (SaaS)
• Maintain responsibility for infrastructure, updates, patching, and security
• Comply with applicable data residency requirements (specify jurisdiction if needed)
• Ensure compliance with standards such as SOC 2, ISO 27001, HIPAA, Fed RAMP, or others as applicable
• Provide guaranteed uptime SLAs (Service Level Agreements) and data backup protocols
• Support secure Single Sign-On (SSO) and Multi-Factor Authentication (MFA)
2. Customer-Hosted Cloud (IaaS/PaaS)
- If the software can be deployed in a customer-managed cloud environment, it must support:
• Microsoft Azure: Compatibility with Windows Server VMs, Azure SQL, Blob Storage, and Azure AD
• Vendors must specify:
• Supported cloud regions and minimum configuration (vCPU, memory, storage, OS images)
• Any required cloud services (load balancer, database instances, storage types)
• Recommended scaling strategy (manual, auto scaling, etc.)
- Resource Modeling Resources:
• Energy efficiency ("EE")/demand response ("DR") programs;
• Distributed energy resources (e.g., photovoltaic, wind, fuel cells, storage, etc.)
• Distributed energy storage, including electric vehicles
• Local renewable resources
• Remote renewable resources
• Changes to existing resources, such as repowering local generation with green hydrogen.
- Resource Modeling Features:
• Load forecasting
• Locational marginal pricing ("LMP") price forecasting
• Congestion hedging strategy
• Economic transmission analysis
• Congestion analysis
• Transmission constraints
• Natural gas pipelines/storage/natural gas demand
• Hydrogen pipelines/storage/hydrogen demand
• Fuel contracts limits and inventories
• Start-ups modeled as hot, warm or cold fuel requirements and/or costs.
• Ramping rates are modeled as ramp up or ramp down MW/minute.
• Operating reserves, spinning requirements, and regulation requirements
• Ability to provide value-add scenarios, for modeling hydrogen and battery energy storage
• Ancillary services production costs
• Batteries and storage, cycling limits, which includes daily, weekly, and annual limits for generation/discharge and payback/charging.
• User defined time horizon (term, year, etc.) of up to 50 years
• Ability to pre-schedule (commit) generators based on a sub-hourly set of interval definitions and then to dispatch, using that commitment result.
- Contract Period/Term: 3 years
- Questions/Inquires Deadline: August 15, 2025
Ask any question about the RFP and its amendments. Instantly surface schedules, deliverables, compliance items, evaluation criteria, and budget details with 100% source-backed answers.
Quick answers about deadlines, eligibility and submission for this solicitation.
No. This opportunity (SYS-1888) closed on August 29, 2025. See similar open RFPs below.
A government agency in California. The buyer's contact and submission details are in the solicitation documents.
Only for USA Organization.
Contract term: 3 years.
Questions and inquiries must be submitted by July 15, 2025.
Yes. After purchase, with a subscription or during a free trial, the RFPPlanet AI Assistant answers questions sourced from this RFP’s documents, such as requirements, evaluation criteria and key dates.
Set up free email alerts and get notified when new government and private-sector bids and tenders match your industry and location. Choose daily or weekly delivery.