The Vendor is required to provide energy management system including all equipment, wiring, hardware, installation, labor, software, construction documents, engineering calculations and diagrams and annual maintenance and support.
- Provide a turnkey solution providing all necessary equipment, labor, wiring, hardware, software, on-site implementation, training and technical support, annual maintenance contract, system design, construction documents, engineering calculations and diagrams for the installation of a fully functioning energy management system at farm.
- Include system design and software implementation, training and annual support.
- Energy management system (EMS) to optimize the energy efficiency of building HVAC usage, lighting, and other facility operations through a system of electrical tools and sensors.
1. Calf barn equipment:
• AAON RTU and lighting upgrades (remove existing Orion controls, provide necessary upgrade to BACnet controls) provide equipment scheduling, alarming and trending, develop graphical interface.
2. Dairy barn equipment:
• Provide BACnet controls or BACnet network thermostats, include discharge air sensor, supply fan status, Dri-steam humidifier (provide BACnet integration into existing Dri-steam humidifier, provide equipment scheduling, alarming and trending, develop graphical interface), acuity lighting controls (install new controller to integrate existing lighting panel).
• The control system shall consist of a high-speed, peer-to-peer network of doc controllers that connect directly to a secure, cloud-based platform.
• This platform will serve as the central repository for all data and provide a web-based operator interface accessible from any conventional web browser.
• The solution must be a fully managed cloud service, eliminating the need for On-premise servers.
• All system data, graphics, and software will be hosted and maintained by the vendor in the cloud.
• Operators shall be able to perform all normal functions, including real-time monitoring and control, through this secure web browser interface.
• The system must also include point-and-click graphical depictions of each mechanical system and building floor plan.
- Contract Period/Term: 3 years
- Voluntary Pre-Proposal Meeting Date: September 12, 2025
- Questions/Inquires Deadline: September 15, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.