The Vendor is required to provide install, and anchor a warehouse pallet flow racking system at the center.
- Services include:
• Pallet Flow Racking System shall include a total of twelve (12) bays with two (2) pallet lanes per bay (twenty-four (24) pallet lanes total).
• The twenty-four (24) pallet lanes will consist of pallet flow rollers with two (2) outside tracks and one (1) inside track.
• Outside track includes one (1) row of 2 – 7/8” rollers on 3” centers.
• Inside track includes two (2) rows of 2 – 7/8” rollers staggered on 3” centers.
• The units must be new and have a full manufacturer’s warranty on all components
- Contract Period/Term: 3 years
- Questions/Inquires Deadline: October 21, 2025
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.