The Vendor is required to provide brine solution production systems to the department.
- Brine Solution Production Systems will grant more flexibility to the State in responding to these snow events.
- Shall have two (2) fork pockets mounted under bottom of hopper. These should be 4"x 8" to accommodate 3" thick forks.
- Coupler area shall be built to add support and guard hopper from damage.
- Hoses that will be disconnected for removal of hopper shall be equipped with quick couplers.
- At a minimum, circulation system shall allow the following functions: making brine, re-circulating entire system, re-circulating holding tank, re- circulating hopper, pumping hopper to holding tank, pumping out hopper, hopper clean out, pumping out holding tank, and re- circulating lines.
- Centrifugal pump shall be 2” x 1½” (minimum), stainless steel, and with ceramic seals of appropriate rating that when combined with motor assembly, shall be capable of pumping 160 gpm at 70 psi.
- Shall have an emergency shut off.
- Shall include a remote control with a minimum of 10ga/3, 50-amp, 10 ft. cord. Switch meets or exceeds UL 4, 4X and 13 standard requirements.
Set up free email alerts and get notified when new government bids, tenders and procurement opportunities match your industry and location. Choose daily or weekly delivery.