The vendor is required to provide to engage a professional services firm to provide comprehensive planning and design services for the proposed project.
• Attractive and contextual with the existing campus buildings and meet the design guidelines established in the campus master plan.
• Energy-efficient and sustainable
• Efficient and economical to construct and operate
• Durable, comfortable, secure, and that achieve a high degree of value for the savannah state university
• “Smart” buildings with the flexibility to respond to rapidly evolving technology in the academic environment.
- Professional services at a minimum include, but is not necessarily limited to, the items outlined below:
• Program validation and cost model
• Existing site conditions analyses
• Measured drawings of existing site conditions as needed
• Conceptual design
• Schematic design
• Design development documents
• Multiple component packages (if using cm at-risk delivery method)
• Guaranteed maximum price (GMP) documents
• Construction documents
• Construction administration
• Interior design
• Furniture, fixture and equipment layout
• Material finish boards
• Signage
• Mechanical, electrical, plumbing, fire protection and communication systems design
• Structural design
• Detailed third party cost estimates at design milestones
• Code review and compliance
• Commissioning support
- Other services may include:
• Full architectural programming
• Civil engineering
• Parking and traffic design
• Landscape and irrigation design
• Furniture, fixtures and equipment selection
• Laboratory design
• Acoustic design
• Audio/visual/it design
• Wayfinding/graphics
• Storm water management permitting
• Budgeting and cost management
• Regular coordination with the construction professional during preconstruction, design and
construction phases
• Quality assurance and quality control (QA/QC)
• Coordination with consultants hired by owner
• Other requirements as per the design professional’s contract
• *Surveying - topo, location of structures/site utilities/trees, construction limits
• *Testing agency – geotechnical evaluation, material testing, special inspections
• *Environmental – phase i environmental site assessment, GEPA.
- Questions/Inquires Deadline: July 07, 2025