A federal contracting office in Lakewood, CO posted “HI FLAP CR562(1) Kilauea Point” (Solicitation) on SAM.gov on October 16, 2026. No response deadline is listed. NAICS 237310. Set-aside: No Set aside used.
Description
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NAME: HI FLAP CR562(1) Kilauea Point PROJECT DESCRIPTION: Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service. To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook. The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook. Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists. Minor utility adjustments and construction is also anticipated. The total project length is approximately 1.70 miles. PRINCIPAL WORK ITEMS: 18,500 square yards of Removal of Pavement, Asphalt 3,370 cubic yards of Roadway Excavation 2,900 ton of Roadway Aggregate, Method 2 4,200 ton of Asphalt Concrete pavement, Type 1 630 square yard of minor concrete Pavement, Reinforced 1,540 linear feet of Curb, Concrete, 16-Inch Depth (Slotted) 5,670 square yards of Sidewalk, Concrete 34 Accessibility Ramps, Concrete ANTICIPATED SCHEDULE: Advertise: End of October or Early November 2026 Bid Opening: December 2026 Award: January 2027 Construction: January 2027 –January 2028 ESTIMATED COST RANGE: The anticipated cost range is between 10,000,000 and $20,000,000.
Key Dates & Details
Posted Date:Friday, 16 Oct, 2026
Response Deadline:Not stated
Set-Aside:NONE
Contracting Office Address:Lakewood, CO
Download Documents
FED-29673
Federal RFPs are free for registered users. Log in or create a free account to open the official notice on SAM.gov.
Questions about this opportunity
Quick answers about the deadline, notice type and who is buying.
When are responses due?
SAM.gov does not list a response deadline for this notice. Agencies often add one in a later update, so check the official notice before you respond.
What does “Solicitation” mean?
A Solicitation is the formal request for offers. Follow the instructions, evaluation criteria and deadline in the official documents when you prepare your response.
Which office is handling this notice?
The contracting office is in Lakewood, CO.
Is this opportunity set aside for small businesses?
No Set aside used.
What NAICS code applies?
NAICS code 237310.
Where are the official documents?
Federal solicitation documents are published on SAM.gov. RFPPlanet links you to the official notice for free once you log in to your RFPPlanet account.
Set up free email alerts and get notified when new government and private-sector bids and tenders match your industry and location. Choose daily or weekly delivery.
We use cookies to improve your experience, remember your preferences, and analyze site traffic. By clicking "Accept", you consent to our use of cookies. Privacy Policy