The vendor is required to provide from qualified security systems integrators for the supply, installation, and commissioning of security equipment for a new construction office building located.
- Security system design review:
• Identifying gaps in design.
• Identifying opportunities to simplify system design while maintaining security integrity.
• Identifying opportunities for cost savings.
• Identifying opportunities for enhancement with minimal impact on budget.
- Security management suite:
• Supply, installation, and configuration of Genetec security center.
• Supply and installation of Genetec security center workstations.
• Supply and installation of security badge printer and badge enrollment reader/encoder.
• Integration with building management systems.
• Integration with building emergency and life safety systems.
• Integration with offsite facility already in operation.
• Remote monitoring capabilities.
• Genetec security center software training.
- Access control systems:
• Supply and installation of door access controls at all designated locations.
• Supply and installation of speed gates at all designated locations.
• Supply and installation of drive gates at all designated locations.
• Supply and installation of door position switches at all designated locations.
• Integration and configuration of access control systems with security management suite.
- Video surveillance systems:
• Supply and installation of high-definition IP cameras.
• Configuration of network video recorders (NVRS) and storage solutions.
• Integration and configuration of video surveillance systems with security management suite.
- Intercom and communication systems:
• Installation of intercoms at all designated locations.
• Integration with security management suite.
- Coordination items:
• Coordinate door lock hardware with project door supplier prior to procurement of door locks.
• Coordinate supply and installation of necessary cabling for all security systems with project electrical contractor.
• Coordinate security system network design with owner.
• Coordinate with owner’s general manager for scheduling work on-site.
- Questions/Inquires Deadline: April 21, 2025