The Vendor is required to provide of this design phase, the selected firm will create a traffic control/controlled use strategy during construction or closed during construction with a detour in place.
- The project design will include:
• Current state analysis of the erosion in this area
• Designing an improved landscape to mitigate the erosion and improve safety for trail users
• Survey
• Geotech
• 100% bid ready construction drawing and project specifications
• Trail traffic control and detour design/plan
• Plans for all construction signage/placement
• Coordination with all responsible stakeholders to complete design
• Obtaining floodplain permits for each location
• 100% Construction plans and project specifications.
• Estimated total cost for project construction
- Contract Period/Term: 1 year
- Pre-Proposal Meeting / Conference (Mandatory) Date: April 3, 2025
- Questions/Inquires Deadline: April 8, 2025