The vendor is required to provide the city optimal surveillance camera coverage project.
- BTU-ss150w/14 00wh-l3
• BTU research LLC – managed field ethernet switch (w/built-in 1400 watt-hours of battery) - ups solid switch, vac power 150w/ extended 1400wh l3/ 4 + 1 POE switch extended model with pole mount; or approved alternate
- BTU-ss240w/14 00wh-l3
• BTU research LLC managed field ethernet switch (w/built-in 1400 watt-hours of battery) - ups solid switch, vac power 240w/extended 1400wh l3/ 4+ 1 POE switch extended model, with pole mount; or approved alternate.
- The maximum expenditure allowed under is limited to $100,000.
- Questions/Inquires Deadline: June 17, 2025