The Vendor is required to provide comprised of supplying and installing all the wiring & equipment required for a fully operational emergency responder radio coverage system (radio repeater system/ BDA).
- Provide the design and installation of a radio signal coverage solution as this fire station has known signal coverage issues.
- The fire station was built in 1994 and contains approximately 8,624sq. Ft. The main fire station building has a total of two (2) floors and accessible attic space over the apparatus bay.
- Emergency responder coverage system/BDA will be required to be installed in the communications closet on the second-floor mezzanine communications closet located within the apparatus bay.
- The entire fire station is powered by an emergency backup generator.
- Public safety radio enhancement (Also known as emergency responder radio coverage) design and installation, including all components, wiring and optimization.
- Maintenance of public safety radio enhancement system under contract for specified warranty period.
¬- Include frequency band information. 700/800 MHz interoperability is required; both digital and analog radios.
- Contract Period/Term: 2 years
- Pre-Bid Meeting & Site Walkthrough Date: June 13, 2025
- Questions/Inquires Deadline: June 18, 2025