The vendor is required to provide for the fabrication, delivery, and installation of signage for the frontier center lobby expansion.
• Designing and fabricating signage in compliance with local codes, regulations, and accessibility standards (e.g., ADA requirements).
• Fabrication and installation of large acrylic tube ceiling fixture consisting of approx.
• 1500 screen print wrapped acrylic tubes varying in length from 18” to 74” mounted in an aluminum channel and attached to the facility ceiling. reference attached drawings for details and descriptions of signage and fixture.
• Installing signage and ceiling fixture in coordination with the general contractor and the city of falls.
• Installation is expected to occur concurrently with
other trades working on-site.
• Provide rough order of magnitude (ROM) estimate for overall project
• Current estimated installation time frame is between 12/25 – 2/26.
• Work closely with architect for final design, installation and fabrication.
• CAD files available to successful submitters upon request prior to fabrication if required.
- Questions/Inquires Deadline: June 25, 2025