The vendor is required to provide an empty refrigerated cooler with approximately 5,000 to 7,000 square feet of space (plant cooler) between September 20 (preferred) and march 31 of each year
- The cooler square footage may be in one cooler or two separate coolers, depending on the layout of the contractor’s space and the needs of the district.
- The plant cooler(s) must be equipped with an automatic compressor shutoff and operate at a consistent temperature of 33-34 degrees Fahrenheit.
- Contractor will maintain the cooling system in working condition for the duration of the contract.
- Contract Period/Term: 6 Month