The Vendor is required to provide to install new welcome signs throughout the city.
- There are a total of 14 locations throughout the city that require welcome sign installations.
- All of these installations will be located within the right of way (R.O.W) the signs will need to be fabricated to existing brand specifications and then installed by the contractor.
- Pre‐bid Meeting Date: June 09, 2025
- Questions/Inquires Deadline: June 12, 2025