The Vendor is required to provide fabrication and installation services for the wayfinding signage project.
- Pre-Construction
• Verify sign locations (in field)
• Survey
• Subsurface utility coordination
• Develop production drawings
- Sign Fabrication
- Construction & Installation
• Demolition and disposal of existing signage
• Use of durable, breakaway, weather-resistant materials
• Installation of new footings and signage
• Compliance with ADA standards and district guidelines where applicable
• As-builts
- Questions/Inquires Deadline: January 20, 2026