USA(New Hampshire)
AVEQ-0023

RFP Description

The vendor is required to provide that audio video hardware recording system for include:
1. A/V equipment
• Microphones
• Cameras
• Controllers
• System components to permit equipment operation and function
 - Current hearing room a system specification
• Approximate room dimensions: 31-ft wide by 45-ft long. square footage ~1,395 ft².
• 120-volt standard power outlets: 23.
• Ethernet outlets (rj45 connector): 15.
• Microphone outlets: 21.
• Current A/V system in place: o QSC amplifier cmx 300v (located in sound closet)
o Shure dfr22 audio processor (located in sound closet)
o Audio-technical uhf synthesized diversity receiver atw-r3100b (located in sound closet)
o Mackie SR series 24.4.2-bus mixing console (located in sound closet)
o 17 – AUDIX microphones (ats-10)
o 2 – Logitech 1080p cameras
o 7 – QSC ceiling speakers
o 1- ptv-1 wireless microphone system
2. Installation
• Technician and labor
• Wiring
• Fixtures and brackets
• Miscellaneous hardware (tie wires, fasteners, screws, washers, nuts, bolts which are required for installation).
• The proposed A/V system shall be compatible with the in-place connections (electrical power and ethernet) and not require additional types of connections.
3. Integration
• Technician and labor
• Programing
• Any software requirements to allow (digital/analog) sound and video capture of hearing room a input during simultaneously operating WebEx, for the record (FTR) gold recording suite, and an integrated digital recorder ensuring A/V capture across all mechanisms
4. Warranty, training/support
• Required to warranty all the equipment awarded to vendor for a period of not less than one (1) year.
• Vendors are to specify technical support (including user training) for the a/v system and components for the number of months after the installation is complete
- Last Day for Site Visitations Date: March 21, 2025
- Questions/Inquires Deadline: March 28, 2025

Timeline

RFP Posted Date: Wednesday, 19 Mar, 2025
Proposal Meeting/
Conference Date:
Non-mandatory
Friday, 21 Mar, 2025
Deadline for
Questions/inquiries:
Friday, 28 Mar, 2025
Proposal Due Date: Friday, 11 Apr, 2025
Authority: Government
Acceptable: Only for USA Organization
Work of Performance: Offsite
Download Documents

Similar RFPs

USA(Michigan)