The vendor required to provide uninterruptible power supply (ups) system equivalent to or better than a 10 KVA/9 kw online double-conversion ups with an optional external maintenance bypass cabinet.
- Requirements:
• Ups capacity: 10 KVA/9 kw minimum
• Voltage: 220v single-phase
• Design: online double-conversion with true sine wave output
• Runtime: minimum 15–16 minutes at full load
• Input power factor: ≥ 0.99
• Recharge time: ≤ 6 hours to 90% capacity
• Redundancy: non-redundant configuration, hot-swappable modules for maximum flexibility
• Display: lcd interface with mimic diagram, digital metering, event logging, and customizable alarm setpoints
• Network interface: SNMP, MODBUS, or BACNET for integration with building management systems
• Compliance: ul 1778 (latest edition), CUL listed, WEEE, reach, and ROHS compliant.
- Optional and accessory equipment:
• External maintenance bypass cabinet, rated ≥ 15 KVA, ul listed
• Wall-mounted with isolating switch, terminal blocks for hardwired input and output, spring-loaded high-speed manual transfer switch, and lockout and tagout capability
- The contractor shall:
• Provide and deliver a complete ups system meeting or exceeding the specifications outlined in this document, including the ups equipment and optional maintenance bypass cabinet.
• Remove and properly dispose of the existing ups equipment, if requested by the county.
• Install the new ups and bypass cabinet, including all required electrical connections and integration with existing infrastructure.
• Perform startup, configuration, testing, and commissioning to ensure the equipment is fully operational and properly integrated with the site’s systems.
• Verify proper functionality of electrical connections, communications interfaces, network integration, and system alarms or monitoring features.
• Confirm compatibility with the existing site electrical infrastructure prior to installation.
• Include in the quote the lead time, delivery method, and total cost (equipment plus installation).
• Ensure all work complies with applicable NFPA, NEC, and local electrical codes.
- Contract Period/Term: 2 years
Ask any question about the RFP and its amendments. Instantly surface schedules, deliverables, compliance items, evaluation criteria, and budget details with 100% source-backed answers.
Quick answers about deadlines, eligibility and submission for this solicitation.
No. This opportunity (SYS-3005) closed on November 12, 2025. See similar open RFPs below.
A government agency in Florida. The buyer's contact and submission details are in the solicitation documents.
Only for USA Organization.
Contract term: 2 years.
Yes. After purchase, with a subscription or during a free trial, the RFPPlanet AI Assistant answers questions sourced from this RFP’s documents, such as requirements, evaluation criteria and key dates.
Set up free email alerts and get notified when new government and private-sector bids and tenders match your industry and location. Choose daily or weekly delivery.