The Vendor is required to provide for system integration services.
- Provide data highway cable installation instruction specifications, including a complete communication test protocol to verify integrity of highway prior to use.
- Provide system architecture/topology drawings that clearly identify the major control system components and the communication network that connect them.
- The drawings shall clearly identify all purchaser connection points including power, grounding, network, and signal wire termination.
- Alarms, Reports, and Logs: Provide prints of alarm lists, settings, prioritizations grouping, and alarm action proposed to be added to the FactoryTalk application.
- The Integrator shall perform an extensive acceptance test. The system shall be completely assembled and powered up.
- The Integrator shall provide the test facility and technician for the entire Factory Acceptance Test.
- Provide a preferred technology which balances access with cyber security concerns.
- Contract Period/Term: 2 years
- Questions/Inquires Deadline: November 24, 2025